Quote
Factory Buyer Rate Questions

Blog

When Should FMCG and Upstream Electronics Use an FTZ? Flows, Risks, and How to Think About It

20 Oct 2025

By Andy Wang     Photo:CANVA


If you run FMCG/e-commerce, you juggle multi-language labels, last-minute packaging tweaks before promos, and fast replenishment while cash feels tight.
If you are in upstream electronics, parts land first and you often do kitting/light assembly to order, with serial and lot traceability that must be airtight.
In those moments, it is fair to ask: would a free trade zone (FTZ) help?
This piece walks through when it helps, when it does not, how it differs from Standard Entry/Bonded Warehouse, and the common gotchas. Read it to self-assess before you move.

 

Three quick triage questions

  • Will these goods enter U.S. consumption, and do you want to defer duty timing? → Compare FTZ vs. Bonded Warehouse vs. Standard Entry.

  • Is this a short-term import that must be re-exported? → Consider TIB.

  • Do you export a large share after import and care about cash recovery? → Consider Duty Drawback.
    (DTC small parcels to individuals, ≤ USD $800 per shipmentSection 321.)

One-line takeaway: An FTZ usually is not about “cheaper duties.” It is about deferring duty and doing relabeling/kitting/light assembly inside the zone, paying duty only when goods exit the zone for U.S. consumption. For pure transshipment on tight timelines, Standard Entry or a Bonded Warehouse is often more direct.


Quick glossary

  • Weekly Entry: lets you consolidate multiple zone exits in the same week into one entry, which can cap Merchandise Processing Fee (MPF) exposure. (Details in § Four.)
  • Inverted Tariff: make a lower-duty finished good from higher-duty parts in the zone; when entered for U.S. consumption, duty follows the finished good’s rate (within approved production scope). (Details in § Four.)
  • PF / NPF (Privileged Foreign / Non-Privileged Foreign): you choose at admission whether to lock the duty rate (PF) or keep flexibility (NPF); changes later are highly constrained.
  • ICRS (Inventory Control & Recordkeeping System): an auditable system that tracks serial/lot/status, supports cycle counts, reconciliations, and audits.
  • Admission (CBP Form 214 / CF 214): the filing that brings goods into the FTZ and sets PF/NPF/ZR (Zone-Restricted) status.
  • CBP (U.S. Customs and Border Protection): the authority for FTZ activation, compliance, and audits; fees and procedures follow CBP policy.
  • FTZ Board (Foreign-Trade Zones Board): approves new or expanded zones and production authority.


I.When does an FTZ make sense?

Sometimes you need to see the market before you decide where the inventory goes. Sometimes promo season squeezes cash. Sometimes you want relabeling and kitting in a more controllable, internal flow. Those are FTZ moments. Ask yourself three quick questions:

  • How often do we relabel or re-pack?
  • Would deferring duty ease cash during peaks?
  • If we move relabeling into the zone, does replenishment become steadier?


If most answers lean yes, put the FTZ on the comparison list.


II. Two common scenarios

1) FMCG (Fast-Moving Consumer Goods)

Multi-language labels, packaging refreshes, small-lot frequent drops: this is routine. Do it in the zone first; enter for U.S. consumption only when the destination is set. If plans change and the goods ship abroad, U.S. import duty usually never occurs.
When it’s not ideal: pure transshipment on tight timelines; Standard Entry or Bonded Warehouse is usually faster and simpler.

2) Upstream electronics (enclosures / Printed Circuit Boards, PCB / fans, etc.)

Zone-side kitting and light assembly are common: bundle mechanicals, fans, and cables to order, then decide: pay duty at exit to U.S. consumption, or export out of the zone. What really matters here: tight serial/lot traceability, document alignment zone vs. non-zone (invoice, packing list, carton marks), and order-driven gatekeeping on when to exit.
 

III. Three regimes: at a glance

Duty timing: Standard Entry = duty at arrival; Bonded Warehouse = duty when withdrawn for consumption; FTZ = duty when exiting the zone into U.S. customs territory (exports generally incur no U.S. import duty).

What you can do: Standard Entry/Bonded Warehouse focus on storage and distribution; FTZ allows relabeling, kitting, and light assembly within rules.

Governance burden: FTZ requires activation plus an auditable ICRS and solid records.

 

Add-on: Other routes at a glance (when to use them)

  • TIB (Temporary Importation under Bond):
    Use for short-term imports that must be exported, such as trade shows, repair/rework, or samples.
    Not for long-term stocking or U.S. consumption; failure to re-export carries risk.

  • Duty Drawback:
    Use when you do export after import and want to reclaim duties and MPF later.
    Trade-offs: slower cash recovery, heavy documentation, strict matching.

  • Section 321 (USD $800 de minimis):
    Use for DTC small parcels to individuals, ≤ USD $800 per shipment.
    Limits: scenario and value caps; not a replenishment or B2B path.

Quick pointer: If you need duty deferral plus in-zone relabeling/kitting/light assembly with traceability and flexible replenishment, FTZ is the right stage to compare. Otherwise, stick with Standard Entry/Bonded Warehouse, or use the alternatives above.

 

IV. Financial & tariff advantages

  1. Weekly Entry
    Consolidate multiple same-week exits into one entry; MPF is assessed per entry with a cap, which can materially help high-frequency shippers.
    Watch-out: caps, thresholds, and eligibility update over time; follow CBP’s latest.
  2. Inverted Tariff
    If parts are higher duty than the finished good, approved zone production can lower the effective duty at entry.
    Watch-out: only within FTZ Board-approved production or processing scope.
  3. PF vs. NPF
    PF locks the rate at admission; NPF keeps flexibility to use the finished-good rate later.
    Watch-out: after Admission, changes are hard; decide upfront.

These operate under 19 CFR Part 146 and FTZ Board rules, with your broker or operator designing the compliance flow.


V. Getting started: a simple three-step path

  1. Fit check: Is relabeling or kitting routine, with volatile demand? If not, Standard Entry or Bonded Warehouse may be better.
  2. Basics in place: ICRS for traceability, reconciliation, and audits; people and SOPs (Standard Operating Procedures) aligned.
  3. Choose the on-ramp: Tight timelines? Pilot in an existing third-party FTZ warehouse. More runway? Explore new zone or expansion and decide whether you’re optimizing cash flow, MPF structure, or tariff inversion.


VI. Timeline sense-check

  • Existing FTZ warehouse: anywhere from a few weeks to multiple weeks, depending on facility and CBP reviews.
  • New zone or expansion: roughly 7.5–10 months from application acceptance, plus CBP activation, site inspection, and system readiness.

    Some geographies can move faster under the ASF (Alternative Site Framework), but it is still case by case.


VII. Common blind spots

  • Define what is allowed vs. not allowed in the zone before you build the flow.
  • Set PF/NPF/ZR at Admission (CBP Form 214) and keep the document chain straight from Admission → in-zone ops → exit/entry/export.
  • If you touch medical, RF (Radio Frequency), or DG (Dangerous Goods) categories, check the extra rule sets up front.

 

Closing thought

There is no one-size-fits-all answer. Pick one SKU or one leg in the flow and run a small pilot. Watch the impact on cash timing, replenishment stability, and audit hygiene. That usually tells the truth faster than months of desk analysis.

In practice, execution is typically handled by an FTZ operator (a CBP-activated FTZ warehouse) together with a licensed customs broker. This article stays neutral and is meant to help you self-assess whether you need FTZ support before engaging the right partners.

 

Appreciate if you could share TGL Blog among your friends who are interested in first-hand market information of supply chain and updated economic incidents.

Get a Quote Go Top